Your Safety Library2024-11-13T17:27:25-04:00

Your Safety Library

From software to safety these are the top questions

Videos

Body placeholder for text paragraph. A paragraph is a self-contained unit of text

Featured FAQs

Frequently Asked Questions

Check out the answers to frequently asked questions about the Smart Safety Lockout Tagout software program.

Can any employee perform a periodic inspection?2025-12-23T09:56:43-04:00

Whether or not an employee can perform a periodic inspection is determined by the permissions assigned within the software.

An authorized employee must have the proper permission level assigned to access the periodic inspections workflow within the Smart Safety Pro lockout tagout app.

Do I need to print and file periodic inspection records?2025-12-23T09:56:11-04:00

No. The lockout tagout software portal stores all periodic inspections in the database permanently. Periodic inspection reports can be run on-demand as needed.

During an OSHA audit, periodic inspection data can be produced for any equipment criteria and any date range at the click of a button.

What is the benefit of mobile lockout tagout?2025-12-23T10:33:53-04:00

Mobile lockout tagout software offers visibility and insights into machine status that are not possible with a manual lockout tagout program. When a machine is locked out, the authorized employee scans a QR code, views each step of the procedure, and confirms on the screen that the step was completed successfully.

This offers two major benefits. First, it ensures that the procedure is followed correctly and includes documentation validation. Next, it changes the status of the equipment to “locked out”.

The Smart Safety Pro equipment dashboard displays real-time operating status of all equipment so that program managers verify details without walking out to the machine.

How do I track when periodic inspections are due?2025-12-23T10:03:19-04:00

With the Smart Safety Pro lockout tagout app, program managers no longer need to manually track when periodic inspections are due. The software takes over tracking inspections and ensures that a period inspection is triggered every year.

The number of periodic inspections due is displayed at 30, 60, and 90 day intervals. This information is accessible via reporting, the web portal dashboard, and the periodic inspection workflow in the lockout tagout mobile app.

From the Blog

Latest Stories & Articles

Our blog offers valuable information about LOTO regulations, LOTO compliance, LOTO program development, LOTO best practices, and LOTO software.

Go to Top